Top Images
Construction Photos

Below are Construction Photo Albums.  Please either click on the photo album icon or photo album description to view photos.

Photo Album
Local Building & Repair Projects

One of the many ways DWM lends a hand in the community is through repair work on local homes as well as small building projects.

Photo Album
DWM Basketball Goals

In 2009 a full court basketball court was poured.  In May of 2010, Hope Missions helped to form, pour and set up two permanent goals at the ends of the court.  Thank you Church of Christ at Manor Woods, MD for donating the goals!

Photos
Ikce Oyate Building Addition - Phase I - (Walls)

Phase I consists of preparing the site, pouring concrete basement walls & floor.  Getting everything ready for the "wood" construction to begin.  Walls were completed by several local men and the work group Hope Missions.

Photo Album
Ikce Oyate Building Addition - Phase I - (Floor)

Floor was completed by several local men and the work group Hope Missions.


Photo Album
Ikce Oyate Building Addition - Phase I - (Footings)

Footings were completed by several local men and the work group Hope Missions.


Photo Album
Ikce Oyate Building Addition - Phase I - (Site Preparation)

Site preparation was headed up by John Kalb and Bryan Albers, Huron, SD, along with local men.


Photo Album
Wall Section Construction at the National Missionary Convention (NMC) 2009

The interior and exterior walls for the Ikce Oyate Christian Center Building Addition were constructed by teens at the NMC in November of 2009, moved, and stored at Diamond Willow Ministries until construction begins in April 2010.

US POSTAL DELIVERY ONLY:  P.O. Box 438 | Fort Thompson, South Dakota 57339 | (605) 245-2685
PRIVATE CARRIER ONLY:  22850 North Shore Road | Fort Thompson, South Dakota 57339 | (605) 245-2685

©2007 - 2010 Diamond Willow Ministries - All Rights Reserved.